Construction of a bridge. We built an 18-tonne, 25 metre-long bridge made of S-355 J2G3. We also shot-blasted and painted the bridge on our premises.
Construction of a bridge. We built an 18-tonne, 25 metre-long bridge made of S-355 J2G3. We also shot-blasted and painted the bridge on our premises.
Construction of a mixed-use bridge, 14-tonnes. Corten steel mixed-purpose bridge in Bergara (Guipúzcoa-Spain).