Construction of a box-girder bridge featuring two hollow 50 m-long girders. Each girder is made of S-355 J2+N with a C4 finish. The 50 m-long girders weigh 48 tonnes each. The components were transported to the site and assembled in one night. The bridge is located on the N131 in San Sebastián.
Tag Archives: bridges
Construction of a bridge over the Urola river
Construction of a bridge. We built an 18-tonne, 25 metre-long bridge made of S-355 J2G3. We also shot-blasted and painted the bridge on our premises.
Corten steel footbridge in Tolosa
We assembled a 30-tonne Corten steel footbridge over the Araxes rive, in Usabal to the north of Tolosa.
Construction of a mixed-use bridge
Construction of a mixed-use bridge, 14-tonnes. Corten steel mixed-purpose bridge in Bergara (Guipúzcoa-Spain).