Construction of a box-girder bridge featuring two hollow 50 m-long girders. Each girder is made of S-355 J2+N with a C4 finish. The 50 m-long girders weigh 48 tonnes each. The components were transported to the site and assembled in one night. The bridge is located on the N131 in San Sebastián.