Boilerworks – Public works
Production and installation of an arched roof in Oviedo
Production and on-site assembly of a 50 metre-long arched roof in Oviedo. Continue reading
Manufacture of metal structures for underground car parks
We produced the majority of the metal structures used to build the underground car parks of San Sebastián (Buen Pastor, Okendo, Concha, etc.), using innovative assembly processes that generated cost savings. Continue reading
Production of a large metal roof structure for a cement plant
Leorpe specialises in the construction of fixed metal structures and temporary, easily-dismantled structures made of carbon steel or stainless steel. This photo shows the metal roof structure we built for the Cementos Rezola cement plant in San Sebastián. Continue reading
Construction of a box-girder bridge
Construction of a box-girder bridge featuring two hollow 50 m-long girders. Each girder is made of S-355 J2+N with a C4 finish. Continue reading
Construction of a bridge over the Urola river
We built an 18-tonne, 25 metre-long bridge made of S-355 J2G3. We also shot-blasted and painted the bridge on our premises. Continue reading
Production of a corten steel footbridge in Hernani
Construction and Assembly of steel footbridge cut. Weight: 18 tonnes and length: 25 metres. Designed by the Ingelan engineering Continue reading
Production of footbridges (4) over the Paseo de Lugaritz
Production of footbridges (four footbridges) over the Paseo Lugaritz (Paseo Aizkorri to Avda Zarautz) in San Sebastián. Continue reading
Construction and assembly of a corten steel footbridge in San Sebastián
Construction and assembly of a 90 m-span Corten steel footbridge weighing 133 tonnes, linking the Paseo de Frederico Garcia Lorca with the Cristina-Enea pask in San Sebastián. Continue reading
Corten steel footbridge in Tolosa
We assembled a 30-tonne Corten steel footbridge over the Araxes rive, in Usabal to the north of Tolosa. Continue reading
Corten steel and shot-blasted steel bridges
We have built and assembled several bridges made of Corten steel or shot-blasted, painted steel. The image shows just some of the projects: top left, the Irún toll plaza on the N1 motorway; top right Alcampo, bottom left ErrenterÃa and bottom right Irún. Continue reading
Construction of a footbridge made of S-355-J2G3N
Construction of a footbridge made of S-355-J2G3N, designed by engineering company Ingelán. It is 28 metres long and weighs 35 tonnes. We shot-blasted and painted the structure in our plant. Continue reading
Construction of a mixed-use bridge
Construction of a mixed-use bridge, 14-tonnes. Corten steel mixed-purpose bridge in Bergara (Guipúzcoa-Spain). Continue reading