Leorpe supplied a 4-compartment mould made of carbon steel S-275-JR, intended for the formwork of the columns of a bridge crossing the river Garonne in Bordeaux, over which the TGV high speed trains will run. The mould is 6 metres high and 8 metres long. It features footwalks and access stairs all around it.